Agenda at a Glance

Pre-Conference Design & Conversion Technical Briefings Day
27th Sept 2010
Main Congress Day One
28th Sept 2010
Main Congress Day Two
29th Sept 2010
Post-Congress Asset Integrity, Reilability & Maintenance Technical Briefings Day
30th Sept 2010

Good preparations done in the Design, Construction and Conversion Phase pays Off

8 out of 10 offshore executives we surveyed with ranked loop holes in the design, construction and conversion phase as the main root for their operational challenges.

With so many phases and parties involved in the design, construction and conversion phase of your vessel, how can you ensure that processes are kept tight to minimize operational breakdowns and inefficiencies?

The design, construction and conversion day will focus on key areas to fast track your projects whilst maintaining optimum quality and effective delivery of your FPSO.

Opening Plenary: FPSO Status Update and future opportunities

Opening Plenary: Developments In Global FPSO Fabrication Capacity & SWOT Analysis Of Chinese FPSO Fabrication Offering

How safe is your asset? How high is its risk of breakdown, downtime or even explosion for example? Material fatigue, corrosion, external pressure and of course human errors all pose a threat of your FPSO break downs. Safety all the more ever is critical for your vessels in deepwater operations where it is subjected to harsh conditions.

Owners and operators of deepwater fields have a statutory requirement to implement processes to ensure asset integrity and reliability at every stage of their FPSO’s lifecycle.

How you demonstrate corporate, statutory and regulatory compliance in areas of high risk across every life cycle of your FPSO?

The asset integrity, reliability and maintenance day will identify and pan out the critical lifecycle stages of your FPSO to ensure compliance and reduce meantime between maintenance.

Owner Keynote: Innovations in FPSO technology

Conceptual benefits with a cylindrical hull for FPSO applications – a review of the technology development and current FPSO projects

Vessel Owner C-level Keynote Panel: The position of FPSO in today’s field development strategy

Keynote Panel: Financing offshore projects: Getting round the specific industry concerns and Commercial Developments

FPSO Technology Innovation: Driving your FPSO Operations to the Next Level: Innovative Electric Power and Automation Solutions for the next generation of FPSO projects

Regulator Insight: Industry and FPSO Health & Safety Performance

Track A:
Track B:
Case Study! Classification and Regulatory Standards to Novel Design Concepts for Deepwater Developments Getting FPSO Financing in Tough Times
Advances in new-build FPSO hull design (as applied to EGINA) Commercial Stimulus for FPSO Contracts in case of Today’s and Future Markets
Case Study! Pioneering automation, control, safety, navigation and telecoms systems to support cost effective floating production facility design Financing of FPSO: A banker’s perspective
Weld Failure Mechanisms of Flare Service Platform in Deepwater FPSO in The Gulf of Guinea The FPSO-sector: Perspectives from the equity market (investors’ views)
Technical Challenges and Cost Effective ways for Conversion of Double Hull Tankers: Lessons learnt from Conversion of Single Hull Tankers Case Study! Legal disputes and Arbitration
Case Study! Efficient and Effective Risk Assessment for Ensuring Minimum Downtime of Your Deepwater Operations Interactive Think Tank Session! Innovative Financing for FPSO in Today's Challenging Economic Climate
Controls and Automation for Enhanced Safety and Efficiency of your FPSO Vessel Heat management techniques for reducing your FPSO operational cost 25 minutes Spotlight! 360° Technology Evaluation

Keynote Regulator Insight: Future of deepwater developments

Track A: Track B:
Panel: Meeting the challenges in the Marine Environment to Improve Your FPSO Operations FPSO – Asset Integrity Assurance
Case Study! How to get an FPSO into the US Gulf of Mexico Think Tank Session! FPSO risk management and cost control (during design and construction) to ensure an on time and under budget project delivery
Case Study! Development and wave tank testing of a cost effective external turret system for Cyclonic areas and North Sea conditions Panel Session: Leveraging on innovative contracting strategies to mitigate the high cost and risk of your FPSO projects
SBM Experiences with Turret Mooring Systems in South East Asia: Examining the latest developments for Deepwater Mooring Technology Challenges and Material Control considerations for FPSO (For West Africa Developments)
Case Study! Minimizing Your FPSO Breakdowns and Downtime through Enhanced Fatigue Analysis Spotlight! 360° Technology Evaluation
Examining a new innovative and stable round shape floating hull structure design
Case Study! Field Proven Innovations for Impact Protection and Life Extension 25 minutes Spotlight! 360° Technology Evaluation

FPSO Congress Cocktail and Evening Activities

Field Operator Closing Plenary: Case Study: Experiences from Managing Efficient FPSO Operations

Chairperson’s Summary: The next Steps Forward for FPSO

 
Early Bird Discount

Early Bird Discount

Register before 15 June 2010 and save SGD$1,600 off!


register-limited-offer-banner

FPSO be heard!

Take the FPSO 2010 Survey


Sponsors & Exhibitors

Sponsors and Exhibitors

Media sponsor

Media Partners

Sponsors and Exhibitors

www-flngsummit-com

Become a Energy IQ Member and receive our weekly newsletter!